Electrical Infrastructure Waste Water Treatment Water Infrastructure Telecommunication Network

Electrical Infrastructure

  • UNIQUE system in Costa Rica
  • Redundant supply from two independent substations: Heredia and Belén ( INTEL )
  • Interconnected through and automatic switching system
  • Capacity of 21 MVA
  • Direct, exclusive lines from each substation.
  • Operated by Empresa de Servicios Públicos de Heredia - E.S.P.H.